1323 Google Earth polygon vertices
1324 Google Earth polygon vertices
1325 Google Earth polygon vertices
A
coordinates
Valorization of 3 research mining permits in the DRC
covering the gold (target>2Moz) and iron (>1bt@65%Fe) deposit
which have never ceased to be valid and in force majeure since their issues
for violation of mining legislation for not having issued research certificates
Administrative situation
Mining permits 1323, 1324, and 1325 are valid and under force majeure since their issuance due to the failure to issue research
certificates, which is a violation of mining legislation. These 3PRs come from 37PRs of the company JEKA sarl which were
obtained through legal means. The documentation is available here. There is no legal obligation to immediately start the iron
export project. The permits issued are solely for gold, and an extension for iron research is a right, as explained on page 4 of this
document SUMMARY.pdf.
According the mining legislation
The
3
mining
research
permits
(PR)
were
granted
by
Ministerial
Orders
in
full
compliance
with
mining
legislation
Doc1323
;
Doc1324
;
Doc1325
According
art
10
du
mining
code
,
only
the
Minister
of
Mines
is
competent
to
grant
and
revoke
mining
permits
by
Ministerial
Orders.
According
art
109
of
the
mining
regulation
,
once
the
PRs
have
been
granted
and
the
surface
area
taxes
paid,
the
mining
registry
issues research certificates
According
art
34
of
the
mining
code,
the
mining
registry
office
is
prohibited
from
processing
any
new
application
for
an
area
already allocated
It is irrevocably established
No Ministerial Order has ever existed to revoke these 3PRs, so they have never ceased to exist.
In violation of Article 109 of the Mining Regulations, the research certificates for these 3PRs were never issued.
Under
Article
34
of
the
Mining
Code,
any
mining
permit
granted
on
an
area
already
covered
by
a
more
recent
mining
permit
is
non-existent
.
The
Congolese
authorities
granted
36
other
PRs
covering
the
3PRs
of
Thaurfin
ltd
to
a
fictitious
applicant
who
graciously
transferred them to the company Iron Mountain Enterprises belonging to Dan Gertler.
The
Congolese
authorities
have
committed
numerous
crimes
in
an
attempt
to
bring
these
36PRs
into
existence
and
to
make
the
3PRs of Thaurfin Ltd disappear.
In conclusion
Thaurfin ltd's 3PRs are valid
These 3PRs have been in
force majeure
since their granting
The 36PR awarded to Dan Gertler
never existed
By
virtue
of
the
maxim
"the
accessory
follows
the
principal"
any
iniquitous
judicial
decision
which
considers
the
existence
of
these 36PR is destroyed by their non-existence.
The
Congolese
authorities
are
liable
for
very
heavy
damages,
in
particular
for
the
harm
caused
by
having
been
prohibited
from
developing these 3PRs.
General Information
General
information
on
the
development
of
the
research
permits
(3PR)
is
available
here
.
The
presence
of
gold
is
crucial
as
it
allows
us
to obtain long-term exploitation permits.
Project Importance
(
cf memo
)
The
3PR
cover
the
Banalia
gold
and
iron
deposit
and
are
under
force
majeure
since
their
issuance.
They
benefit
from
the
2002
mining
code;
under
the
2008
code,
such
a
deposit
can
only
be
allocated
through
a
tender
process.
Logistics
is
often
the
cornerstone
of
the
development
of
iron
ore
deposits.
Being
close
to
the
Congo
River,
river
transport
is
essential;
the
ore
goes
down
the
river.
We
are
developing energy-efficient, secure and seamless river transport, specially adapted to the river.
As
this
file
shows,
the
Banalia
deposit
is
much
more
interesting
to
develop
than
that
of
Simandou,
on
the
one
hand
because
the
export
infrastructure
contributes
to
the
development
of
the
country,
but
also
thanks
to
its
hydroelectric
potential
allowing
it
to
produce steel without CO2 emissions
The history of these 37PR
This
documented
history
reveals
the
dispossession
of
the
3PRs
held
by
Thaurfin
Ltd.
by
36
other
PRs
granted
to
Dan
Gertler
and
the
numerous
turpitudes
of
the
Authorities
to
make
them
exist
since
these
36PRs
are
factually
non-existent.
As
a
result,
the
remaining
34PRs of JEKA have been heavily impacted by this scam.
Solidarity between the company JEKA sarl and Thaurfin ltd
Since
these
two
companies
are
defending
the
same
case,
they
have
joined
forces
to
ensure
that
the
validity
of
the
37PRs
and
their
force majeure status since they were granted are recognised.
File documentation
In
order
to
avoid
any
misinformation,
the
facts
are
documented
in
French
on
this
page
.
Also
published
are
the
letters
sent
to
the
Authorities
with
acknowledgment
of
receipt
which
show
the
preference
for
a
friendly
solution
since
it
is
favorable
to
the
Republic
as
presented
in this summary.
Thaurfin ltd
Thaurfin
Ltd.
was
created
in
July
2012
to
be
a
partner
in
a
real
estate
project
brought
by
its
two
shareholders
who
were
forced
to
leave
it
.
This
company
was
inactive
until
the
3PRs
were
transferred
to
it
on
February
15,
2018.
The
shareholding
has
remained
unchanged since its creation as shown in these
documents
.
Investor
As
long
as
an
investor
has
not
committed
to
developing
these
3PRs,
it
is
preferable
that
the
force
majeure
situation
due
to
the
default
in issuing research certificates continues since the 3PR validity counter remains at zero.
The opening of capital to a partner wishing to settle permanently in DRC is envisaged, any request will be considered.