Administrative situation
Since
their
granting,
the
3
prospecting
mining
permits
(PR)
held
by
Thaurfin
Ltd
have
been
spoliated
by
non-existent
permits
granted
to Dan Gertler
This map of the mining permit portal in the DRC was copied on
April 23, 2022
On February 24, 2022, Ventora Corporation representing the
interests of Dan Gertler abandoned these 36PRs pursuant to this
Memorandum of Understanding dated the 24th of February 2022
The
mining
registry
has
acknowledged
its
fault
for
not
having
issued
the
prospecting
certificates
for
these
3PR
which
has
put
them
in
a
situation of force majeure since their granting in February 2006.
The
mining
registry
acknowledges
that
these
3PRs
were
issued
in
full
compliance
with
mining
legislation
and
have
never
ceased
to
be
valid.
General Information
General
information
on
the
development
of
the
research
permits
(3PR)
is
available
here
.
The
presence
of
gold
is
crucial
as
it
allows
us to obtain long-term exploitation permits.
Project Importance
(
cf memo
)
The
3PR
cover
the
Banalia
gold
and
iron
deposit
and
are
under
force
majeure
since
their
issuance.
They
benefit
from
the
2002
mining
code
;
under
the
2008
code,
such
a
deposit
can
only
be
allocated
through
a
tender
process.
Logistics
is
often
the
cornerstone
of
the
development
of
iron
ore
deposits.
Being
close
to
the
Congo
River,
river
transport
is
essential;
the
ore
goes
down
the
river.
Thaurfin is developing energy-efficient, secure and seamless
river transport,
specially adapted to the river.
As
this
file
shows,
the
Banalia
deposit
is
much
more
interesting
to
develop
than
that
of
Simandou,
on
the
one
hand
because
the
export
infrastructure
contributes
to
the
development
of
the
country,
but
also
thanks
to
its
hydroelectric
potential
allowing
it
to
produce steel without CO2 emission
as documented in the memo
.
The surface of the Republic is discretized into mining squares which are quadrilaterals whose vertices are 30 arc
seconds apart in latitude and longitude (approximately 86 ha) (cf https://thaurfin.com/carre-minier.pdf )
The surface area of the 3 polygons is 471 squares each, which is the maximum authorized by the mining code.
The area of each polygon is 405sqkm and the total area is 1215 sqkm